Atmospheric deposition and acidity exercises
Use the values given; do not look up other constants. Predict the direction of change before calculating.
1. Wet input
Rainfall is 0.600 m/year and nitrate is 20.0 µmol/L throughout. Calculate nitrate input per square metre per year. Use 1 m³ = 1000 L.
A metre of rain over one square metre is one cubic metre.
600 L/m²/year × 20.0 µmol/L = 0.0120 mol nitrate/m²/year. This is a nitrate amount flux. Calling it an acid-equivalent flux requires the form and transformations to be specified.
2. Rain pH
Two rain events both have pH 4.00 but depths of 1.00 and 10.0 mm. In the dilute approximation, calculate free-H⁺ input per m² for each. Does this include all titratable acidity?
1 mm over 1 m² is 1 L; [H⁺] = 10⁻⁴ mol/L.
Inputs are 0.100 and 1.00 mmol H⁺/m². The larger event carries ten times the free hydrogen-ion amount. Other acid–base species and dry deposition are not included.
3. Change the catchment budget
Use the worked budget but reduce neutralisation from 30000 to 20000 eq/year. Keep annual water export fixed. Find the residual equivalent load concentration.
Subtract equivalents before dividing by the annual volume.
Residual = 20000 eq/year. Dividing by 5.00 × 10⁸ L/year gives 4.00 × 10⁻⁵ eq/L = 0.0400 meq/L. It is not a pH and is not a closed-water pulse.
4. A sulfate result
A rain sample contains sulfate. What additional evidence is needed before reporting a strong-acid dose from that result?
Counterions and subsequent transformations affect acidity.
Measure or constrain acidity/alkalinity, major cations including ammonium, other anions, precipitation volume, and dry deposition as relevant. Sulfate may arrive partly as neutral salts. Nitrification, uptake, and catchment reactions can change the net acid budget.
Explore: deposition and dilution
Predict what happens if annual water export doubles while deposition flux and catchment area stay fixed. Change one input at a time and distinguish flux, annual load, and the equivalent concentration.
Reference case: 40000 eq/year of acid input gives 0.0800 meq/L before neutralisation at 500 million L/year water export.
E1. Choose Worked example, then Double water export. Which annual amounts stay fixed? Check the equivalent concentration by hand.
E2. Reset, then double catchment area while keeping water export fixed. Explain why this is a different comparison from doubling both area and water.
E3. Set both acid inputs to zero. Explain why water volume cannot create an acid input.
Model conditions and hand check
The constructed inputs are 20.0 mmol HNO₃ and 10.0 mmol H₂SO₄ per m² per year. At the stated full-neutralisation endpoint, their equivalent flux is (20 + 2 × 10)/1000 = 0.0400 eq/m²/year. Across 1.00 km² this gives 40000 eq/year. Dividing by 500 million L/year gives 0.0800 meq/L; doubling that water export gives 0.0400 meq/L at the same annual load.
These are supplied acid inputs, not sulfate or nitrate measurements treated as free acid. All input is assumed to reach the annual exported water, with no storage, neutralisation, or other sinks. This is an annual equivalent budget, not a closed-lake pulse or a pH prediction. Area and water export are independent controls only for the stated sensitivity comparison.